Design Points

 

  • Safety

    Because school is personnel dense place, the safety of the running machine should be fully considered.

  • Heating capacity

    Usually boarding school has a large requirement of hot water (shower), and during peak hours, the hot water should be produced enough and as soon as possible. The hot water tank should meet the needs of supplying enough hot water all day long.

  • Energy saving

    The machine may run for very long time per day, so in order to reduce the running cost maximally, the energy saving ability of the machine should be fully considered.

Solutions

Equipment:

Rooftop Mounted HVAC Unit

Features:

Fitted for large space place with high working efficiency.

Economical, eco-friendly, and meets the requirements of air conditioner and ventilation by a single device

There is no need for air terminal devices, which simplifies installation

Equipment:

Fresh Air Ventilation Duct Air Conditioner

Features:

The temperature of output air can be controlled precisely between 15℃- 28℃ to make people feel comfortable

Low cost with high efficiency.

Equipment:

Air source heat pump.

Features:

Compared to common fuels, the air source heat pump saves energy and works safely without any pollution.

Related applications

See More